Tue Apr 23, 2024 2:42 am
There are probably four fields (Time, Value, Ease In, Ease Out) in spline view, but only Time it is not confirmed by Tab (but the new number is remain in the field). All fields in Fusion Studio except this one are confirmed with Tab to proceed to the next field. (Auto control advance in UI preference = off )
Time (Tab x 2) --> Ease In (Tab) --> Ease Out (Tab) --> Value (Tab) --> Time ....
This order is also unnatural. I like ..
Time (Tab) --> Value (Tab) --> Ease In (Tab) --> Ease Out (Tab) --> Time ....
Fusion Studio v18.6.6 / DeckLink Mini Monitor 4K
Intel® Core™ i9-13900KS / 128GB RAM / Nvidia Geforce RTX 4090 (546.33) / Windows 10 Pro 22H2
Intel® Core™ i9-7980XE / 128GB RAM / Nvidia RTX A5000 (536.67) / Windows 10 Pro 22H2